PLAY PODCASTS
Let’s Ask Paul Podcast | Episode 192 | Is adding a service disconnect outside a service upgrade?

Let’s Ask Paul Podcast | Episode 192 | Is adding a service disconnect outside a service upgrade?

Listen as Paul Abernathy, CEO, and Founder of Electrical Code Academy, Inc., the leading electrical educator in the country, discusses electrical code, electrical trade, and electrical business-related topics to help electricians maximize their...

Ask Paul | National Electrical Code

October 15, 202421m 54s

Audio is streamed directly from the publisher (dts.podtrac.com) as published in their RSS feed. Play Podcasts does not host this file. Rights-holders can request removal through the copyright & takedown page.

Show Notes

Listen as Paul Abernathy, CEO, and Founder of Electrical Code Academy, Inc., the leading electrical educator in the country, discusses electrical code, electrical trade, and electrical business-related topics to help electricians maximize their knowledge and industry investment.

In this episode, Paul is asked if adding a service disconnect, included with a transfer switch, and changing a 3 wire set of service conductors to now a 4 wire feeder to the existing inside panel which is now a remote distribution panel (Sub-Panel) considered a service upgrade or change?

If you are looking to learn more about the National Electrical Code, for electrical exam preparation, or to better your knowledge of the NEC then visit https://fasttraxsystem.com for all the electrical code training you will ever need by the leading electrical educator in the country with the best NEC learning program on the planet.

Become a supporter of this podcast: https://www.spreaker.com/podcast/ask-paul-national-electrical-code--4971115/support.

Topics

ahjcodecontractorelectricalelectricianelectriciansinspectionsinspectornecservicesupgrades