
Let's Ask Paul | Episode 84 | GEC or EGC to rebar at separate structure – NECA
Listen as Paul Abernathy, CEO and Founder of Electrical Code Academy, Inc. discusses a question from the NECA Code Question of the Day Database. On this episode Paul elaborates on the process of establishing the GES (Grounding Electrode System) at the...
Ask Paul | National Electrical Code
October 25, 202215m 33s
Audio is streamed directly from the publisher (dts.podtrac.com) as published in their RSS feed. Play Podcasts does not host this file. Rights-holders can request removal through the copyright & takedown page.
Show Notes
Listen as Paul Abernathy, CEO and Founder of Electrical Code Academy, Inc. discusses a question from the NECA Code Question of the Day Database. On this episode Paul elaborates on the process of establishing the GES (Grounding Electrode System) at the detached structure when connecting to the rebar. List to learn the facts from The GURU himself.
Become a supporter of this podcast: https://www.spreaker.com/podcast/ask-paul-national-electrical-code--4971115/support.
Become a supporter of this podcast: https://www.spreaker.com/podcast/ask-paul-national-electrical-code--4971115/support.
Topics
codeelectricalelectricianelectriciansnec