PLAY PODCASTS
There aren’t enough cables to meet rising electricity demand: Bottlenecks Series
Episode 134

There aren’t enough cables to meet rising electricity demand: Bottlenecks Series

Zero: The Climate Race · Bloomberg

June 12, 202542m 49s

Audio is streamed directly from the publisher (podtrac.com) as published in their RSS feed. Play Podcasts does not host this file. Rights-holders can request removal through the copyright & takedown page.

Show Notes

High-voltage electricity cables are in huge demand around the world, so much so that a lack of cabling has become a bottleneck throttling the clean energy transition. So why are cable manufacturers so hesitant to expand? Also, how are these giant cables made? And is China about to eat everyone's lunch? Claes Westerlind, chief executive officer of cable manufacturing company NKT, joins Zero to discuss. This is the third episode in Bottlenecks, a series exploring the lesser known obstacles standing in the way of our electrified future.

Explore further:

Zero is a production of Bloomberg Green. Our producer is Oscar Boyd. Special thanks to: Jess Beck, Sommer Saadi, Mohsis Andam and Siobhan Wagner. Thoughts or suggestions? Email us at [email protected]. For more coverage of climate change and solutions, visit https://www.bloomberg.com/green.

See omnystudio.com/listener for privacy information.