PLAY PODCASTS
Board Stiff: Sound Transit Lacks Transit Expertise as Project Delays Drag On
Episode 311

Board Stiff: Sound Transit Lacks Transit Expertise as Project Delays Drag On

(The Center Square) – The Sound Transit Board of Directors has been criticized for a lack of transportation expertise among its members, as the agency continues to see delays to light rail expansion projects and cost overruns to major expansion projects despite massive funding. The Center Square previously reported that more than $21.8 billion in tax revenue was generated by Sound Transit between 1996 and 2023, with $10.3 billion raised between 2019 an 2023 alone. Despite this, the delays to the agency’s taxpayer-backed projects have continued, including the last two stations on the 2 line connecting across Lake Washington, which had their target opening of December 2025 moved to early 2026.

Washington in Focus

June 3, 202513m 22s

Audio is streamed directly from the publisher (afp-444292-injected.calisto.simplecastaudio.com) as published in their RSS feed. Play Podcasts does not host this file. Rights-holders can request removal through the copyright & takedown page.

Show Notes

(The Center Square) – The Sound Transit Board of Directors has been criticized for a lack of transportation expertise among its members, as the agency continues to see delays to light rail expansion projects and cost overruns to major expansion projects despite massive funding. The Center Square previously reported that more than $21.8 billion in tax revenue was generated by Sound Transit between 1996 and 2023, with $10.3 billion raised between 2019 an 2023 alone. Despite this, the delays to the agency’s taxpayer-backed projects have continued, including the last two stations on the 2 line connecting across Lake Washington, which had their target opening of December 2025 moved to early 2026. 

Support this podcast: https://secure.anedot.com/franklin-news-foundation/ce052532-b1e4-41c4-945c-d7ce2f52c38a?source_code=xxxxxx 

Read more: https://www.thecentersquare.com/washington/article_d5a868bf-944c-4909-8c8b-b2d0bada157b.html


Hosted by Simplecast, an AdsWizz company. See pcm.adswizz.com for information about our collection and use of personal data for advertising.