![[Episode #227] – FERC Order 1920](https://cdn.xenetwork.org/ets/wp-content/uploads/sites/2/powerpress/ETS-PodcastArtwork-full.png)
Episode 227
[Episode #227] – FERC Order 1920
What is the new FERC Order 1920, and how can it help pave the way for more transmission capacity to unlock the potential of wind and solar in the US?
The Energy Transition Show with Chris Nelder
June 26, 202431m 42s
Audio is streamed directly from the publisher (media.blubrry.com) as published in their RSS feed. Play Podcasts does not host this file. Rights-holders can request removal through the copyright & takedown page.
Show Notes
What is the new FERC Order 1920, and how can it help pave the way for more transmission capacity to unlock the potential of wind and solar in the US?