PLAY PODCASTS
Episode 7: Supply Chain and Building Supplies
Season 1 · Episode 7

Episode 7: Supply Chain and Building Supplies

On today’s podcast I’m joined by special guest Jeff Rettig, VP of Supply Chain at Builders First Source to talk about the crazy spike in the commodities market especially surrounding lumber products. Lumber prices have sky rocketed recently by almost 4 times compared to what they were this time last year and with demand increasing and supplies tightening due to varying factors, it’s having a huge impact across the industry. For the average sized house build, the lumber alone is costing around $26,000 to $30,000 more than normal and lead times have been gradually increasing with many having to wait as long as 6 months.

The Build Show Podcast · Matt Risinger

May 14, 202130m 19s

Audio is streamed directly from the publisher (cdn.simplecast.com) as published in their RSS feed. Play Podcasts does not host this file. Rights-holders can request removal through the copyright & takedown page.

Show Notes

On today’s podcast I’m joined by special guest Jeff Rettig, VP of Supply Chain at Builders First Source to talk about the crazy spike in the commodities market especially surrounding lumber products. Lumber prices have sky rocketed recently by almost 4 times compared to what they were this time last year and with demand increasing and supplies tightening due to varying factors, it’s having a huge impact across the industry. For the average sized house build, the lumber alone is costing around $26,000 to $30,000 more than normal and lead times have been gradually increasing with many having to wait as long as 6 months. Watch full episodes of Matt on Facebook, Instagram and Build Show Network.  https://www.facebook.com/buildshownetwork https://www.instagram.com/risingerbuild/ https://buildshownetwork.com/go/mattrisinger   Don't miss a single episode of Build Show content. Sign up for our newsletter.

Topics

lumber pricessupply chainguest speakerprocurement