
We're Double Paying
PowerGab · Independence Institute
Audio is streamed directly from the publisher (episodes.captivate.fm) as published in their RSS feed. Play Podcasts does not host this file. Rights-holders can request removal through the copyright & takedown page.
Show Notes
Colorado's planned replacement of coal power plants with renewables leaves a shortfall in energy, but an increase in costs to ratepayers to make that switch. PowerGab Hosts Jake Fogleman and Amy Cooke discuss this with Independence Institute intern and Master's Student Ethan Cornell.
Show Notes:
Xcel, PUC staff, CEO, and UCA petition to delay Comanche 2 retirement until December 31, 2026,
https://i2i.org/wp-content/uploads/Comanche-Unit-2-Variance-Petition.pdf
Settlement for Comanche 1, 2, and 3.
https://www.scribd.com/document/357548188/Comanche-1-2-and-3-settlement
Colorado Sun article
https://coloradosun.com/2022/03/15/comanche-3-xcel-coal-power
Utility Dive Xcel petitions to keep Comanche 2 open
https://www.utilitydive.com/news/xcel-colorado-comanche-2-coal-plant/805250
https://i2i.org/the-big-shortfall-colorados-upcoming-power-plant-closures-and-planned-replacements/