PLAY PODCASTS
T+47: Uncrewed EM-1 Delayed to 2019
Episode 47

T+47: Uncrewed EM-1 Delayed to 2019

Last week was rough for the Space Launch System. An issue with weld tooling was discovered, with some serious consequences, and then a LOX tank dome was dropped and damaged beyond repair. To top it off, NASA announced that EM-1 will fly without crew, and is delayed until 2019.

Main Engine Cut Off · Anthony Colangelo

May 16, 201732m 8s

Audio is streamed directly from the publisher (cdn.simplecast.com) as published in their RSS feed. Play Podcasts does not host this file. Rights-holders can request removal through the copyright & takedown page.

Show Notes

Last week was rough for the Space Launch System. An issue with weld tooling was discovered, with some serious consequences, and then a LOX tank dome was dropped and damaged beyond repair. To top it off, NASA announced that EM-1 will fly without crew, and is delayed until 2019.

This episode of Main Engine Cut Off is brought to you by 12 executive producers—Pat, Matt, Jorge, Brad, Ryan, Laszlo, Jamison, Guinevere, and four anonymous—and 46 other supporters on Patreon.

Topics

main engine cutoffmeconasaexploration mission 1em-1space launch systemorion