
Episode 15
T+15: More SLS Roadmap Details, and Landed Falcon 9 Static Fires
The roadmap for SLS got a little murkier this week thanks to some additional details in the GAO report regarding its cost and schedule. SpaceX test fired a landed core three times in three days last week, paving the way for reuse of the CRS-8 core.
Main Engine Cut Off · Anthony Colangelo
August 3, 201617m 59s
Audio is streamed directly from the publisher (cdn.simplecast.com) as published in their RSS feed. Play Podcasts does not host this file. Rights-holders can request removal through the copyright & takedown page.
Show Notes
The roadmap for SLS got a little murkier this week thanks to some additional details in the GAO report regarding its cost and schedule. SpaceX test fired a landed core three times in three days last week, paving the way for reuse of the CRS-8 core.
- GAO Report Indicates EM-2 Plans to Fly Crew - Main Engine Cut Off
- U.S. GAO - NASA Human Space Exploration: Opportunity Nears to Reassess Launch Vehicle and Ground Systems Cost and Schedule
- NASA updates status and timetable of ambitious Asteroid Redirect Mission | NASASpaceFlight.com
- MSFC propose Aerojet Rocketdyne supply EUS engines | NASASpaceFlight.com
- Landed Falcon 9 First Stage Test Firing - YouTube
- SpaceX Conducts Full-Duration Static Fire of JCSAT-14 Core - Main Engine Cut Off
- SpaceX test fires returned Falcon 9 booster at McGregor | NASASpaceFlight.com
- Next Space Station Cargo Launch From Virginia Targeted for August | NASA
- Email feedback to [email protected]
- Follow @WeHaveMECO
- Support Main Engine Cut Off on Patreon
Topics
space explorationnasaarmantaresspacexfalcon 9orbital atkspaceflightreusabilityspace policyasteroid redirect missionspace launch systemslsorionmeco