PLAY PODCASTS
Merriam's $32M Diverging Diamond Design for Shawnee Mission Parkway

Merriam's $32M Diverging Diamond Design for Shawnee Mission Parkway

Kansas City News Today | 2 Min News | The Daily News Now! · The Daily News Now!

March 12, 20261m 24s

Audio is streamed directly from the publisher (api.fastcast.ai) as published in their RSS feed. Play Podcasts does not host this file. Rights-holders can request removal through the copyright & takedown page.

Show Notes

Merriams $32M Diverging Diamond Design: A Safety and Traffic Boost for Shawnee Mission Parkway and I-35

This podcast episode discusses Merriams plans to revamp a major interchange at Shawnee Mission Parkway and I-35 with a $32M diverging diamond design. The area, which sees over 40K vehicles daily, has logged more than 1,074 crashes in the past five years. The redesign aims to address heavy congestion and enhance safety amidst rapid growth along the corridor, with new projects like apartments and a Trader Joes set to bring more traffic and pedestrians. Public Works Director Celia Kumke emphasizes the changes will improve traffic flow as development progresses. Local residents generally support the plan for better safety and flow, with some expecting a short adjustment period. No construction timeline is set yet, as the city secures funding, but the new Trader Joes is slated to open in 2026, further emphasizing the need for these upgrades.

Support the show:
Get a discount at https://solipillow.com/discount/dnn.

Advertise on DNN:
[email protected]

This is an automated, high-level news summary based on public reporting.
Report issues to [email protected].

View sources & latest updates:
https://sources.thednn.ai/6545b15979200e5c