
Episode 435
Connecting Neighborhoods with a Recreational Path
May 19, 2024 ~ Joe Louis Greenway Executive Director Leona Medley speaks with Mark about the Joe Louis Greenway, a 29.7-mile recreational path that will connect parks and neighborhoods across Detroit, Dearborn, Highland Park, and Hamtramck allowing residents and visitors to travel safely from McNichols to the riverfront—all without a car—through a combination of new trails, on-street protected bike lanes and links to existing trails like the Dequindre Cut and the Riverwalk. The project is expected to be completed by 2027.
May 19, 202410m 47s
Audio is streamed directly from the publisher (injector.simplecastaudio.com) as published in their RSS feed. Play Podcasts does not host this file. Rights-holders can request removal through the copyright & takedown page.
Show Notes
May 19, 2024 ~ Joe Louis Greenway Executive Director Leona Medley speaks with Mark about the Joe Louis Greenway, a 29.7-mile recreational path that will connect parks and neighborhoods across Detroit, Dearborn, Highland Park, and Hamtramck allowing residents and visitors to travel safely from McNichols to the riverfront—all without a car—through a combination of new trails, on-street protected bike lanes and links to existing trails like the Dequindre Cut and the Riverwalk. The project is expected to be completed by 2027. Hosted by Simplecast, an AdsWizz company. See https://pcm.adswizz.com
for information about our collection and use of personal data for
advertising.