PLAY PODCASTS
Ep.862 - Get all Trades Going the Same or Right Speed - Last Planner® Implementation Series
Season 9 · Episode 862

Ep.862 - Get all Trades Going the Same or Right Speed - Last Planner® Implementation Series

Elevate Construction

July 12, 20239m 5s

Audio is streamed directly from the publisher (traffic.libsyn.com) as published in their RSS feed. Play Podcasts does not host this file. Rights-holders can request removal through the copyright & takedown page.

Show Notes

In this podcast we cover:

  • What happens when trades can go faster.
  • Why it is important to get them going the same or right speed.
  • How you can do that.

If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).

Also, here are links to our YouTube Channels:

· LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg