Ep.861 - The 6 Takt Steering & Control Strategies - Last Planner® Implementation Series
Season 9 · Episode 861

Ep.861 - The 6 Takt Steering & Control Strategies - Last Planner® Implementation Series

Elevate Construction

July 12, 202313m 45s

Audio is streamed directly from the publisher (traffic.libsyn.com) as published in their RSS feed. Play Podcasts does not host this file. Rights-holders can request removal through the copyright & takedown page.

Show Notes

In this podcast we cover:

  • The process to follow after zone control walks.
  • What the walks are looking for.
  • What are the 6 strategies to create flow once you have identified a problem.

If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).

Also, here are links to our YouTube Channels:

· LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg