PLAY PODCASTS
Ep.852 - Design Your Interaction Spaces - Last Planner® Implementation Series
Season 9 · Episode 852

Ep.852 - Design Your Interaction Spaces - Last Planner® Implementation Series

Elevate Construction

June 29, 202316m 5s

Audio is streamed directly from the publisher (traffic.libsyn.com) as published in their RSS feed. Play Podcasts does not host this file. Rights-holders can request removal through the copyright & takedown page.

Show Notes

In this podcast we cover:

  • Why designing your trailer, conference room, and other interaction spaces is so crucial.
  • What items should you consider.
  • How do you align those with your meeting structure?

If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).

Also, here are links to our YouTube Channels:

· LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg