PLAY PODCASTS
Ep.510 - Improvements to the Last Planner System
Season 6 ยท Episode 510

Ep.510 - Improvements to the Last Planner System

Elevate Construction

March 12, 202216m 39s

Audio is streamed directly from the publisher (traffic.libsyn.com) as published in their RSS feed. Play Podcasts does not host this file. Rights-holders can request removal through the copyright & takedown page.

Show Notes

We should constantly be improving. That includes the Last Planner System. Today we talk about how to do just that!

Also, please sign up for our 2 Hour Free Takt Production System Course here: https://www.elevateconstructionist.com/takt-fundamentals

Also, click here to subscribe to any of our YouTube channels:

leanSuperintendent: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg

leanSurvey: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

leanTakt: https://www.youtube.com/channel/UC6M8U0xBex2hytTLEU7Xreg

In this podcast we cover:

  • Why finishing early is not a problem
  • What principles in the system can be improved
  • Why it is important to improve them

If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two ๐Ÿ˜Š).