Ep.1421 - The Last Planner®️ System - Part 4
Audio is streamed directly from the publisher (traffic.libsyn.com) as published in their RSS feed. Play Podcasts does not host this file. Rights-holders can request removal through the copyright & takedown page.
Show Notes
This episode wraps up our Last Planner series and sets the stage for a brand-new Last Planner Implementation Guide with real-world visuals and field-proven steps.
Here's what you'll learn:
- Why the classic "should–can–will–did" ladder fails and how to rebuild it with macro-level Takt so your plans are both realistic and reliable.
- How to structure work by zones, not dates, to shorten throughput time without fantasy durations.
- Why shielding and screening at the weekly level is already too late and what to do months earlier instead.
- The power of First Run Studies (done 3–6 weeks out) to guarantee crews only start what they can finish on time.
- How to use workable backlog as swing capacity for the train of trades keeping flow intact and crews productive.
- A clear line in the sand: why CPM can't be your master schedule and what to use instead.
This isn't just theory, it's the foundation for a field-ready manual that teams can actually follow. If you're serious about reliable promises, real flow, and project delivery that works, this episode is your blueprint.
👉 Hit play and close out the Last Planner series strong.
If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).
Also, here are links to our YouTube Channels:
· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
· LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw