Ep.1113 - Last Planner® Has the Concept of PULL wrong!
Audio is streamed directly from the publisher (traffic.libsyn.com) as published in their RSS feed. Play Podcasts does not host this file. Rights-holders can request removal through the copyright & takedown page.
Show Notes
In this podcast we cover:
- What pull is.
- Why pull is not our first method.
- What will happen if you follow the stupidity of what the industry teaches now about pull.
In this episode, Jason challenges one of the most misunderstood concepts in lean construction: pull. Too often the industry treats pull as the master principle, ignoring the long supply chains, complex procurement, and predictive planning that real projects demand. Jason explains why Last Planner implementations frequently fail without forecasting, and he dismantles the myth that just-in-time delivery means skipping laydown yards or advance procurement. With real examples like switchgear lead times and curtain wall staging, he shows how the industry has pull wrong and what needs to change. You will learn why predictive planning and tact are essential, how pull should function as a refining tool, and what it takes to finally align construction with lean principles that actually work in the field.
If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).
Also, here are links to our YouTube Channels:
· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
· LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw