
Episode 97
Franco Giaquinto: The Future of Construction Scheduling with Ipsum
Scheduling is at the core of construction projects, the team at Ipsum have taken a fresh look at schedule planning and created a lightweight, easy to use product that promises to provide top notch features for mid-market and larger contractors. CEO Franco Giaquinto outlines their progress and plans for the future.
Constructed Futures, A Quantum Rise Podcast · Franco Giaquinto
April 5, 202228m 35s
Audio is streamed directly from the publisher (cdn.simplecast.com) as published in their RSS feed. Play Podcasts does not host this file. Rights-holders can request removal through the copyright & takedown page.
Show Notes
Follow Franco here:
Check out Ipsum here: https://www.ipsumapp.co/
Topics
schedulingconstruction technologycontechconstruction scheduling