
Audio is streamed directly from the publisher (anchor.fm) as published in their RSS feed. Play Podcasts does not host this file. Rights-holders can request removal through the copyright & takedown page.
Show Notes
Engineer Bob Ortblad challenges the IBR Program’s claims about the I-5 Bridge’s seismic risk. He argues that the existing bridge design is more resilient than the proposed replacement, raising concerns about earthquake vulnerability. Read his full letter at https://www.clarkcountytoday.com/opinion/letter-ibrs-seismic-lie/ on www.ClarkCountyToday.com #I5Bridge #SeismicRisk #BridgeEngineering #Infrastructure #Transportation #ClarkCountyWa #LocalNews