Studio 60 on the Sunset Strip 05 "The Long Lead Story" & 06 "The Wrap Party" | SunsetChatz 03
Studio 60 on the Sunset Strip is the greatest television program of all time. (This is a skit, sorry, sketch, sorry, lie).
Chatz: A Television Podcast · Six Dettmar from Scanline Media, Magellan and Allen
Audio is streamed directly from the publisher (cdn.simplecast.com) as published in their RSS feed. Play Podcasts does not host this file. Rights-holders can request removal through the copyright & takedown page.
Show Notes
Studio 60 on the Sunset Strip is the greatest television program of all time. (This is a skit, sorry, sketch, sorry, lie).
Six Dettmar joins us this season from Scanline Media!
Music used in this episode includes "Klepotonic Swing" by Tri-Tachyon.
Email: [email protected]
Our main podcast feed art was done by Camilla Franklin, whose work can be found at https://camillafranklin.myportfolio.com/
Email: [email protected]
Our main podcast feed art was done by Camilla Franklin, whose work can be found at https://camillafranklin.myportfolio.com/