PLAY PODCASTS
8 Most Expensive Engineering Mistakes
Season 1 · Episode 1

8 Most Expensive Engineering Mistakes

When you're building a house, a bridge, or some other impressive construction, some serious planning must be done, and every detail matters. The construction of the Tacoma Narrows Bridge in Washington was finished 1940, a twin suspension bridge was unique and one-of-the-kind construction never seen before. In today’s equivalent, it cost about 1 billion bucks. Still, despite the amount of money spent, the bridge lasted slightly over 4 months. The engineers apparently missed one highly important issue - the wind. Read more: https://brightside.me/articles/8-most... #brightside Animation is created by Bright Side. ---------------------------------------------------------------------------------------- Music by Epidemic Sound https://www.epidemicsound.com Check our Bright Side podcast on Spotify and leave a positive review! https://open.spotify.com/show/0hUkPxD... Subscribe to Bright Side: https://goo.gl/rQTJZz ---------------------------------------------------------------------------------------- Our Social Media: Facebook: / brightside Instagram: / brightside.official TikTok: https://www.tiktok.com/@brightside.of... Stock materials (photos, footages and other): https://www.depositphotos.com https://www.shutterstock.com https://www.eastnews.ru ---------------------------------------------------------------------------------------- For more videos and articles visit: http://www.brightside.me

Bright Side

January 13, 202413m 42s

Audio is streamed directly from the publisher (traffic.megaphone.fm) as published in their RSS feed. Play Podcasts does not host this file. Rights-holders can request removal through the copyright & takedown page.

Show Notes

When you're building a house, a bridge, or some other impressive construction, some serious planning must be done, and every detail matters. The construction of the Tacoma Narrows Bridge in Washington was finished 1940, a twin suspension bridge was unique and one-of-the-kind construction never seen before. In today’s equivalent, it cost about 1 billion bucks. Still, despite the amount of money spent, the bridge lasted slightly over 4 months. The engineers apparently missed one highly important issue - the wind.


Read more: https://brightside.me/articles/8-most...

#brightside


Animation is created by Bright Side.

----------------------------------------------------------------------------------------

Music by Epidemic Sound https://www.epidemicsound.com


Check our Bright Side podcast on Spotify and leave a positive review! https://open.spotify.com/show/0hUkPxD...


Subscribe to Bright Side: https://goo.gl/rQTJZz

----------------------------------------------------------------------------------------

Our Social Media:

Facebook:   / brightside  

Instagram:   / brightside.official  

TikTok: https://www.tiktok.com/@brightside.of...


Stock materials (photos, footages and other):

https://www.depositphotos.com

https://www.shutterstock.com

https://www.eastnews.ru

----------------------------------------------------------------------------------------


For more videos and articles visit:

http://www.brightside.me

Learn more about your ad choices. Visit megaphone.fm/adchoices