PLAY PODCASTS
New Bridge Rises: Baltimore's Rebuild After Collapse

New Bridge Rises: Baltimore's Rebuild After Collapse

Annapolis News Today | 2 Min News | The Daily News Now! · The Daily News Now!

March 26, 20261m 28s

Audio is streamed directly from the publisher (api.fastcast.ai) as published in their RSS feed. Play Podcasts does not host this file. Rights-holders can request removal through the copyright & takedown page.

Show Notes

Two years after the Francis Scott Key Bridge collapse, construction on its replacement is underway. Massive steel pilings are being driven into the riverbed, and officials have added concrete fenders to prevent future ship strikes. The new bridge, a modern cable-stayed design, is set to open around 2030, with costs estimated between $4.3 billion and $5.2 billion. Despite the tragedy, local leaders are determined to rebuild stronger and faster than ever before.

Support the show:
Get a discount at https://solipillow.com/discount/dnn.

Advertise on DNN:
[email protected]

This is an automated, high-level news summary based on public reporting.
Report issues to [email protected].

View sources & latest updates:
https://sources.thednn.ai/219c5e6470322a6a