PLAY PODCASTS
This week on Lively, a change order spikes the cost of the Washington Bridge demolition.
Episode 3718

This week on Lively, a change order spikes the cost of the Washington Bridge demolition.

A Lively Experiment - Presented by Rhode Island PBS · Ocean State Media

October 25, 202428m 59s

Audio is streamed directly from the publisher (rss.art19.com) as published in their RSS feed. Play Podcasts does not host this file. Rights-holders can request removal through the copyright & takedown page.

Show Notes

This week on a Lively Experiment, a change order more than doubles the cost of the Washington Bridge replacement. Plus, a look at local political races. And is using AI in school cheating? Moderator Jim Hummel is joined by Republican Strategist Lisa Pelosi, Providence Journal State House reporter Patrick Anderson, and Boston Glober Reporter and Rhode Island Weekly contributor Steph Machado.

Topics

rhode islandProvidencejim hummelrhode island politicsa lively experimentRhode Island PBSripbs